{"id":21866,"date":"2019-03-14T06:00:53","date_gmt":"2019-03-14T10:00:53","guid":{"rendered":"https:\/\/linitiative.ca\/International\/gaz-signature-dun-contrat-pour-le-developpement-du-champ-de-ain-tsila-a-illizi\/"},"modified":"2019-03-14T06:00:53","modified_gmt":"2019-03-14T10:00:53","slug":"gaz-signature-dun-contrat-pour-le-developpement-du-champ-de-ain-tsila-a-illizi","status":"publish","type":"post","link":"https:\/\/linitiative.ca\/International\/gaz-signature-dun-contrat-pour-le-developpement-du-champ-de-ain-tsila-a-illizi\/","title":{"rendered":"Gaz : Signature d\u2019un contrat pour le d\u00e9veloppement du champ de A\u00efn Tsila \u00e0 Illizi"},"content":{"rendered":"<h4 class=\"title-14\"\/>\n<p class=\"p3\"><span class=\"s3\"><strong>U<\/strong><\/span>n contrat en EPC relatif au d\u00e9veloppement du champ gazier de A\u00efn Tsila (Illizi) a \u00e9t\u00e9 sign\u00e9, hier \u00e0 Alger, entre le groupement Isarene (Sonatrach, Petroceltic et Enel) et Petrofac international (UAE) LLC.<\/p>\n<p class=\"p3\">Situ\u00e9 dans le p\u00e9rim\u00e8tre d\u2019Isarene, \u00e0 160 km au nord-ouest de la wilaya d\u2019Illizi, le projet de d\u00e9veloppement du champ gazier de A\u00efn Tsila permettra la r\u00e9cup\u00e9ration de 64 milliards de m\u00e8tres cubes de gaz avec une production journali\u00e8re de 10,3 millions de m\u00e8tres cubes de gaz de vente, 11\u00a0500 de barils de condens\u00e2t et de 17\u00a0000 barils de GPL sur un plateau de 14 ans.<\/p>\n<p class=\"p3\">D\u2019un montant de 123 milliards de dinars, le contrat en EPC (Engineering, Procurement and Construction\/Ing\u00e9nierie, Approvisionnement et Construction) consiste \u00e0 r\u00e9aliser un centre de traitement de gaz (CPF), une centrale \u00e9lectrique de 125 MW. Le contrat consiste \u00e9galement \u00e0 r\u00e9aliser un r\u00e9seau de collecte de 110 km pour le raccordement de 30 puits pr\u00e9vus pour le First Gas, un syst\u00e8me d\u2019exp\u00e9dition d\u2019une longueur de 356 km et des utilit\u00e9s.<\/p>\n<p class=\"p3\">Ce contrat, dont la mise en service interviendra dans 42 mois \u00e0 partir de son entr\u00e9e en vigueur, devrait permettre la production de trois produits, \u00e0 savoir le gaz \u00e0 sec (10,3 millions m<sup>3<\/sup>\/jour), le condens\u00e2t (10\u00a0550 bbl\/jour) et le GPL (17 117 bbl\/jour).<\/p>\n<div class=\"yuzo_related_post style-1\" data-version=\"5.12.88\">\n<p><h3>Related Post<\/h3>\n<\/p>\n<div class=\"yuzo_wraps\">\n<div class=\"relatedthumb relatedpost-559979 c11\"><a href=\"https:\/\/www.elwatan.com\/regions\/est\/jijel\/universite-de-jijel-les-mycoses-et-les-urgences-cardiaques-au-menu-des-lde-23-02-2019\"\/><\/p>\n<p><span class=\"yuzo__text--title c10\">Universit\u00e9 de Jijel : Les mycoses et les urgences &#8230;<\/span><\/div>\n<div class=\"relatedthumb relatedpost-553362 c11\"><a href=\"https:\/\/www.elwatan.com\/regions\/centre\/alger\/malgre-le-retard-enregistre-alger-tente-de-sadapter-aux-personnes-handicapees-15-01-2019\"\/><\/p>\n<p><span class=\"yuzo__text--title c10\">Malgr\u00e9 le retard enregistr\u00e9 : Alger tente de s\u2019ada&#8230;<\/span><\/div>\n<div class=\"relatedthumb relatedpost-148023 c11\"><a href=\"https:\/\/www.elwatan.com\/edition\/actualite\/il-faut-instaurer-un-mecanisme-de-prise-de-decision-et-de-validation-locale-pour-avancer-sur-ce-sujet-07-09-2018\"\/><\/p>\n<p><span class=\"yuzo__text--title c10\">Il faut instaurer un m\u00e9canisme de prise de d\u00e9cisio&#8230;<\/span><\/div>\n<div class=\"relatedthumb relatedpost-560907 c11\"><a href=\"https:\/\/www.elwatan.com\/edition\/actualite\/le-groupe-cevital-aux-decideurs-votre-continuite-est-ce-celle-de-la-continuite-dans-le-sabotage-27-02-2019\"\/><\/p>\n<p><span class=\"yuzo__text--title c10\">Le groupe Cevital aux d\u00e9cideurs : \u201cVotre con&#8230;<\/span><\/div>\n<\/div>\n<\/div>\n<p><span class=\"post-views-label\">Post Views:<\/span> <span class=\"post-views-count\">525<\/span><\/p>\n<p>Auteur: Anis Khecheba<br \/>\n<a href=\"https:\/\/www.elwatan.com\/edition\/actualite\/gaz-signature-dun-contrat-pour-le-developpement-du-champ-de-ain-tsila-a-illizi-14-03-2019\">Cliquez ici pour lire l&rsquo;article depuis sa source.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Un contrat en EPC relatif au d\u00e9veloppement du champ gazier de A\u00efn Tsila (Illizi) a \u00e9t\u00e9 sign\u00e9, hier \u00e0 Alger, entre le groupement Isarene (Sonatrach, Petroceltic et Enel) et Petrofac international (UAE) LLC. Situ\u00e9 dans le p\u00e9rim\u00e8tre d\u2019Isarene, \u00e0 160 km au nord-ouest de la wilaya d\u2019Illizi, le projet de d\u00e9veloppement du champ gazier de [&hellip;]<\/p>\n","protected":false},"author":1743,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[73,53],"tags":[],"class_list":["post-21866","post","type-post","status-publish","format-standard","hentry","category-actualite","category-algerie"],"_links":{"self":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts\/21866","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/users\/1743"}],"replies":[{"embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/comments?post=21866"}],"version-history":[{"count":0,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts\/21866\/revisions"}],"wp:attachment":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/media?parent=21866"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/categories?post=21866"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/tags?post=21866"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}