{"id":89817,"date":"2020-06-22T15:18:36","date_gmt":"2020-06-22T19:18:36","guid":{"rendered":"https:\/\/linitiative.ca\/International\/douala-grand-mall-la-phase-1-en-cours-de-finalisation\/"},"modified":"2020-06-22T15:18:36","modified_gmt":"2020-06-22T19:18:36","slug":"douala-grand-mall-la-phase-1-en-cours-de-finalisation","status":"publish","type":"post","link":"https:\/\/linitiative.ca\/International\/douala-grand-mall-la-phase-1-en-cours-de-finalisation\/","title":{"rendered":"Douala Grand Mall : la phase 1 en cours de finalisation"},"content":{"rendered":"<p>Un jet de pierre de l\u2019a\u00e9roport interna\u00adtional de Douala, les passants peuvent d\u00e9j\u00e0 contempler la b\u00e2tisse impo\u00adsante qui, il y\u2019a quelques mois n\u2019\u00e9tait encore que sur les maquettes. Aujourd\u2019hui, le Douala Grand Mall affiche d\u00e9j\u00e0 fi\u00e8re allure. Les travaux de constructions du plus grand centre commercial d\u2019Afrique centrale sont \u00e0 un taux de r\u00e9alisation de 95%.<\/p>\n<p>Lire aussi : <strong><a href=\"https:\/\/ecomatin.net\/la-phase-i-du-douala-grand-mall-en-cours-de-finalisation\/\">La phase I du Douala Grand Mall en cours de finalisation\u00a0<\/a><\/strong><\/p>\n<p>Depuis le 11 avril 2018, date de pose de la premi\u00e8re pierre, les travaux avancent \u00e0 grand pas sous la houlette de l\u2019entreprise sud-africaine Raubex Renovo, en charge de la construction. Plus de 600 ouvriers d\u00e9ploy\u00e9s sur le chantier, et pour des r\u00e9sultats qui ne font l\u2019ombre d\u2019aucune contestation. Sur le site, l\u2019aire a \u00e9t\u00e9 enti\u00e8rement re\u00adcouverte de pav\u00e9s, le bardage des panels achev\u00e9, les sys\u00adt\u00e8mes \u00e9lectriques et de cli\u00admatisation sont fonctionnels. La station total attenante au Grand Mall est \u00e9galement achev\u00e9e, ainsi que le parking, le carrelage, les espaces verts et jardins, le marquage, la nu\u00adm\u00e9rotation et les luminaires entres autres. Les travaux du plus important complexe commercial de la sous-r\u00e9gion Afrique centrale s\u2019articulent autour des espaces loisirs, d\u00e9tente et bien-\u00eatre, shop\u00adping, services et logistique, le parc du syst\u00e8me \u00e9lectrog\u00e8ne, le sous-sol, ainsi que le par\u00adking et le point de d\u00e9barque\u00adment des usagers.<\/p>\n<p>A l\u2019int\u00e9rieur comme \u00e0 l\u2019ext\u00e9\u00adrieur, les ing\u00e9nieurs mettent un point d\u2019honneur sur le volet de la d\u00e9coration. Un plafond lumineux est par ailleurs en cours d\u2019installa\u00adtion, lequel va conf\u00e9rer une ambiance unique \u00e0 l\u2019int\u00e9rieur de la b\u00e2tisse. Pour la livrai\u00adson totale de la phase 1, les promoteurs se veulent rassu\u00adrants. \u00abNous pouvons avec certitude affirmer que d\u2019ici un mois nous aurons livr\u00e9 la premi\u00e8re phase de notre pro\u00adjet\u00bb, confie Alain Tchakount\u00e9 le responsable de la commu\u00adnication du projet.<\/p>\n<p>Lire aussi : <strong><a href=\"https:\/\/ecomatin.net\/douala-grand-mall-deja-plus-de-60-de-reservations-des-espaces\/\">Douala Grand Mall : d\u00e9j\u00e0 plus de 60% de r\u00e9servations des espaces\u00a0<\/a><\/strong><\/p>\n<p><strong>Phase 1<\/strong><\/p>\n<p>La premi\u00e8re phase de construction du Douala Grand Mall comprend un multiplexe de 5 salles de ci\u00adn\u00e9ma de 1000 places, un su\u00adpermarch\u00e9 (Carrefour) d\u2019une superficie de 3000 m2, un spa et un spectra beaut\u00e9 \u00e9tendu sur 750 m2. A cela s\u2019ajoute un parking d\u2019une capacit\u00e9 de 640 voitures, 22 restaurants, un centre de loisirs, 160 magasins, des espaces com\u00admerciaux et boutiques. Cette phase est r\u00e9alis\u00e9e \u00e0 hauteur de 95% et les espaces sus\u00admentionn\u00e9s sont d\u2019ailleurs pr\u00eats pour une bonne partie, \u00e0 accueillir leurs occupants. Les open-spaces r\u00e9serv\u00e9s aux banques sont livr\u00e9s. Ainsi que l\u2019espace r\u00e9serv\u00e9 aux entreprises de t\u00e9l\u00e9pho\u00adnie mobile, de t\u00e9l\u00e9commu\u00adnications, et les pharmacies. \u00abcompleted\u00bb, peut-on lire sur les baies vitr\u00e9es des espaces livr\u00e9es.<\/p>\n<p><strong>Cap vers la phase 2<\/strong><\/p>\n<p>Etape cruciale du vaste pro\u00adjet, le complexe commercial sera c\u00f4toy\u00e9 par un immense business Park dans lequel sera \u00e9rig\u00e9 un h\u00f4tel intercon\u00adtinental de luxe. Sur une su\u00adperficie totale de 52.000 m2, la seconde phase du projet Douala Grand Mall se pr\u00e9\u00adpare sereinement. \u00abAvant m\u00eame d\u2019\u00eatre construit, l\u2019h\u00f4\u00adtel 5 \u00e9toiles qui va jouxter le Douala Grand Mall est d\u00e9j\u00e0 quasiment r\u00e9serv\u00e9. La ville de Douala ne dispose pas d\u2019un h\u00f4tel de luxe \u00e0 sa di\u00admension. Nos clients et par\u00adtenaires sont d\u00e9licats et nous allons apporter une solution \u00e0 leurs attente en mati\u00e8re d\u2019h\u00f4tel\u00bb pr\u00e9cise Caroline Bapeck Marketing manager du projet.<\/p>\n<p>Lire aussi : <strong><a href=\"https:\/\/ecomatin.net\/les-travaux-de-construction-du-douala-grand-mall-seront-acheves-au-plus-tard-en-juin-2020\/\">\u00ab Les travaux de construction du Douala Grand Mall seront achev\u00e9s au plus tard en juin 2020 \u00bb<\/a><\/strong><\/p>\n<p>Notons que le Douala Grand Mall est le fruit d\u2019un parte\u00adnariat entre le fonds d\u2019in\u00advestissement britannique Actis et l\u2019entreprise came\u00adrounaise Douala Retail and Convention Centre (Drcc). Les travaux sont ex\u00e9cut\u00e9s par l\u2019entreprise sud-afri\u00adcaine Raubex-Renovo, sp\u00e9\u00adcialis\u00e9e dans la construction de grands \u00e9difices \u00e0 travers le monde. Co\u00fbt de l\u2019inves\u00adtissement b\u00e9n\u00e9ficiaire des facilit\u00e9s accord\u00e9es par la loi sur l\u2019incitation \u00e0 l\u2019investis\u00adsement, environ 80 milliards de FCFA. D\u2019apr\u00e8s les estima\u00adtions des concepteurs de ce projet, environ 4500 emplois directs et indirects seront g\u00e9n\u00e9r\u00e9s par le Douala Grand Mall. Ces derniers tablent par ailleurs sur une fr\u00e9quentation de l\u2019ordre de 300.000 visi\u00adteurs par mois.<\/p>\n<p><strong>Interview<\/strong><\/p>\n<p><img decoding=\"async\" data-attachment-id=\"16525\" data-permalink=\"https:\/\/ecomatin.net\/douala-grand-mall-la-phase-1-en-cours-de-finalisation\/douala-grand-mall-1\/\" data-orig-file=\"https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1.jpg\" data-orig-size=\"695,580\" data-comments-opened=\"0\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;ECO-MATIN3&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1587980666&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"DOUALA-GRAND-MALL-1\" data-image-description=\"\" data-medium-file=\"https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1-300x250.jpg\" data-large-file=\"https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1.jpg\" class=\"wp-image-16525 c2\" src=\"https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1.jpg\" alt=\"\" srcset=\"https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1.jpg 695w, https:\/\/ecomatin.net\/wp-content\/uploads\/2020\/06\/DOUALA-GRAND-MALL-1-300x250.jpg 300w\" sizes=\"(max-width: 695px) 100vw, 695px\"\/><\/p>\n<p>Mathurin Kamdem,\u00a0<em>CEO Douala Retail and Convention Centre (Interview parue dans EcoMatin N\u00b0329 du lundi 27 avri 2020.)<\/em><\/p>\n<p>\u00abNous tablons sur un soft opening aux alentours du mois de septembre 2020\u00bb<\/p>\n<p><em>Grand artisan du projet Douala Grand Mall &amp; Business Park, Mathurin Kamdem, CEO Douala Retail and Convention Centre (DRCC) ras\u00adsure sur le respect des d\u00e9lais initiaux ainsi qu\u2019il se projette sur l\u2019ouverture officielle au grand public de la capitale \u00e9conomique du Cameroun.<\/em><\/p>\n<p><strong><em>Vous avez annonc\u00e9 la fin des travaux pour le deuxi\u00e8me trimestre 2020. Allez-vous tenir dans les d\u00e9lais ?<\/em><\/strong><\/p>\n<p>Le constructeur Raubex reste ferme sur ses enga\u00adgements d\u2019ach\u00e8vement des travaux au cours de ce deuxi\u00e8me trimestre 2020. C\u2019est-\u00e0-dire au plus tard \u00e0 la fin du mois de juin 2020. Nous devons toutefois nous attendre \u00e0 des perturbations possibles de ce calendrier du fait de la s\u00e9v\u00e8re pand\u00e9mie actuelle du Covid-19, qui est un cas de force majeure. Les cadences de production sont consid\u00e9rablement r\u00e9\u00adduites sur le site, du fait des mesures tr\u00e8s strictes qui ont \u00e9t\u00e9 prises, en vue de prot\u00e9\u00adger les travailleurs et limi\u00adter leur exposition \u00e0 toute contamination au Covid-19. Parmi celles-ci, on peut citer : le partage d\u2019informations sur la pand\u00e9mie ; le renfor\u00adcement et l\u2019am\u00e9lioration des mesures d\u2019hygi\u00e8ne (comme le lavage r\u00e9gulier des mains au savon et \u00e0 l\u2019eau, la mise \u00e0 disposition des solutions hy\u00addro alcooliques pour tous) ; le respect de la distanciation physique des travailleurs, notamment dans les bus de transport ; la protection des travailleurs par le port sys\u00adt\u00e9matique et obligatoire des masques et EPI, qui \u00e9taient d\u00e9j\u00e0 une r\u00e9alit\u00e9 avant le Co\u00advid-19. Enfin, la mesure ma\u00adjeure est la syst\u00e9matisation des contr\u00f4les de temp\u00e9rature de tous avant l\u2019entr\u00e9e sur le site des travaux.<\/p>\n<p><strong><em>Qu\u2019en est-il de l\u2019ouverture officielle ?<\/em><\/strong><\/p>\n<p>L\u2019ouverture au public quant \u00e0 elle, d\u00e9pend de plusieurs autres param\u00e8tres, notam\u00adment, la prise de posses\u00adsion et l\u2019am\u00e9nagement des espaces commerciaux par les enseignes et marques diverses, ainsi que la mise en place des stocks de lance\u00adment. Toutes ces op\u00e9rations devraient \u00eatre massivement enclench\u00e9es actuellement pour s\u2019achever en m\u00eame temps que la fin des travaux g\u00e9n\u00e9raux \u00e9voqu\u00e9e pr\u00e9c\u00e9\u00addemment. Ce pan de notre programmation est celui le plus s\u00e9v\u00e8rement handi\u00adcap\u00e9 par la pand\u00e9mie du Covid-19 qui s\u00e9vit actuel\u00adlement, car les approvision\u00adnements souffrent de l\u2019arr\u00eat de la production, suite aux diff\u00e9rents confinements et la fermeture des diff\u00e9rentes fronti\u00e8res aux quatre coins du globe.<\/p>\n<p>Nos pr\u00e9visions actuelles, bas\u00e9es sur un retour quasi normal de l\u2019activit\u00e9 mon\u00addiale dans les trois prochains mois, tablent sur un \u00ab soft opening \u00bb aux alentours du mois de septembre 2020 ; suivi d\u2019une inauguration of\u00adficielle qui restera \u00e0 pr\u00e9ciser en fonction de l\u2019impact r\u00e9el que nous observerons rela\u00adtivement \u00e0 la pand\u00e9mie du Coronavirus qui, \u00e0 coup s\u00fbr, va impacter le calendrier d\u2019ouverture du Mall.<\/p>\n<div class=\"awac-wrapper awac widget posts-list-widget-11\">\n<h4 class=\"widget-title\">Le plus r\u00e9cent<\/h4>\n<\/div>\n<p>Auteur: EcoMatin<br \/>\n<a href=\"https:\/\/ecomatin.net\/douala-grand-mall-la-phase-1-en-cours-de-finalisation\/\">Cliquez ici pour lire l&rsquo;article depuis sa source.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Un jet de pierre de l\u2019a\u00e9roport interna\u00adtional de Douala, les passants peuvent d\u00e9j\u00e0 contempler la b\u00e2tisse impo\u00adsante qui, il y\u2019a quelques mois n\u2019\u00e9tait encore que sur les maquettes. Aujourd\u2019hui, le Douala Grand Mall affiche d\u00e9j\u00e0 fi\u00e8re allure. Les travaux de constructions du plus grand centre commercial d\u2019Afrique centrale sont \u00e0 un taux de r\u00e9alisation de [&hellip;]<\/p>\n","protected":false},"author":1969,"featured_media":89818,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[82,78],"tags":[],"class_list":["post-89817","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cameroun","category-economie"],"_links":{"self":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts\/89817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/users\/1969"}],"replies":[{"embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/comments?post=89817"}],"version-history":[{"count":0,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/posts\/89817\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/media?parent=89817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/categories?post=89817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/linitiative.ca\/International\/wp-json\/wp\/v2\/tags?post=89817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}